Advanced Planning & Scheduling

  • Home
  • Production Planning

HOW WE CAN HELP

Do you have a dynamic production environment where a production schedule is never final? Does something always come up last-minute?

The Advanced Planning & Scheduling system always creates an optimal schedule regardless of the number of changes. In a matter of seconds. Also in case of last-minute changes.

Gewijzigde orders

Spoedorders, annuleringen of additionele orders direct verwerken in de planning zonder leverproblemen

Aanpassing levertijd

De productie planning aanpassen wanneer nieuwe of bestaande klanten een andere levertijd verlangen

Storingen & ziekte

Optimaal omgaan met onverwachte situaties zoals storingen of ziekte van productiepersoneel

Voorraden

De productie aanpassen op basis van de beschikbare voorraden bij tekorten of overschotten

Planwisely Advanced Planning & Scheduling

Production planning made easy

Planning

The core of Planwisely APS is the scheduling engine. Based on AI, Planwisely generates an optimal production schedule per production line for the coming days within seconds. You have instant insight into which batch is scheduled at what time based on your preconditions.

But of course, you can also manually enter preferences and conditions that our AI then takes into account.

Scheduling in a nutshell:
Production Scheduling

Planners and operations must be able to work together seamlessly. Planning is therefore shared for each production line via Planwisely directly with colleagues in the production environment. Production employees can easily indicate which batches are ready and communicate directly with the planners via the platform.

You know? The production schedule for the next few days is made. Everything seems to fit nicely and delivery agreements can be met. And then a big order may come along. But it has to be delivered within a few days.

With the Order Promising module, you can assess in seconds whether that can be practically realized. Enter the desired order and Planwisely immediately calculates the impact on the planning. If the order is confirmed, the planning can be adjusted in an instant.

In a nutshell:

Every planning depends on the actual production process. Your factory is therefore recreated in our virtual Factory, with all production lines, preconditions and dependencies. This allows Planwisely to calculate all possible planning scenarios in order to arrive at an optimal schedule.

Factory Planner

In Masterdata, you can specify the basic data of the products that Planwisely schedules for. You can enter master data about:

50%

20 tot 50% tijdsbesparing

van de planner
20%

5 tot 20% tijdsbesparing

op omsteltijden
30%

5 tot 30% besparing

op maximale voorraad
100%

On-time / in-full

waar stuur jij op?

MEER WETEN?

Download de brochure

Want to learn more about Advanced Planning & Scheduling? Download the factsheet with more information.

What to expect:

Or do the impact scan.